92 construction terms everyone should understand

Apr 7, 2024Bolster6 min read
92 construction terms everyone should understand
In this article
  1. The Plain-English Construction Glossary You’ll Actually Use
  2. Regulations, Permits, and Compliance
  3. Contracts, Legal, and Financial Terms
  4. Insurance and Risk Management
  5. Project Management, Administration, and Documentation
  6. Design, Drawings, and Visualization
  7. Site Work, Earthwork, and Foundations
  8. Structural Elements and Concrete Work
  9. Structural Loads and Framing Concepts
  10. Mechanical, Electrical, and Specialty Systems
  11. Scheduling and Acceleration
  12. Roles and Responsibilities
  13. Bonus contractor terms that come up constantly

TLDR:

Construction runs smoother when everyone speaks the same language. Use this glossary to prevent confusion on bids, plans, contracts, and jobsite communication.

The Plain-English Construction Glossary You’ll Actually Use

Construction has its own language. Even experienced pros run into unfamiliar terms, and for newer team members it can feel like drinking from a fire hose. This list is a quick-reference glossary you can share with your crew, office staff, or even clients to keep everyone aligned.

Regulations, Permits, and Compliance

  1. ADA (Americans with Disabilities Act) — Accessibility requirements for buildings and public-facing spaces.
  2. Building code — Rules that govern how structures must be designed and built for safety.
  3. Zoning — Rules that define permitted land use (residential, commercial, setbacks, height).
  4. Building permit — Official approval from the local authority to begin work.
  5. Building line — Boundary/setback line inside which construction must occur.
  6. Certificate of Occupancy (CO) — Approval that a building meets requirements and can be occupied.
  1. Bid — Price offered to perform a defined scope of work.
  2. Alternate bid — A second option offered alongside the main bid (different method/material).
  3. Bid bond — Financial guarantee a bidder won’t back out after submitting.
  4. Allowances — Budget placeholders for items not fully selected yet.
  5. Alteration — Change to an existing structure without increasing footprint.
  6. Back charge — Charging a subcontractor for costs caused by their work or delays.
  7. Contract overrun — Actual cost ends up higher than budget/contract amount.
  8. Contract underrun — Actual cost ends up lower than budget/contract amount.
  9. Cost-plus agreement — Client pays actual costs plus a markup/fee.
  10. Fixed fee (lump sum) — One total price for the defined scope.
  11. GMP (Guaranteed Maximum Price) — Contract cap; costs above the cap are typically contractor risk (unless scope changes).
  12. Holdback / Retainage — Portion of payment withheld until completion requirements are met.
  13. Lien — Legal claim against property for unpaid labor/materials.
  14. Payment application (Pay App) — Formal request for a progress payment.
  15. Penalty clause — Contract clause that charges contractor for late completion.
  16. Performance bond — Financial guarantee that the contractor will perform as agreed.
  17. Time and materials (T&M) — Billing based on actual labor time and materials used.
  18. Unit rate bid — Pricing per unit (sq ft, linear ft, cubic yard) then totaling.

Insurance and Risk Management

  1. Builder’s risk insurance — Coverage for a structure under construction and certain onsite materials.

Project Management, Administration, and Documentation

  1. Appraisal — Property valuation for lending or insurance.
  2. Construction budget — Planned costs for materials, labor, subs, overhead, etc.
  3. Construction documents — Full set of plans, specs, schedules, contracts, and supporting docs.
  4. Daily progress report — Day-by-day log of work completed, deliveries, issues, weather, etc.
  5. Design-build — One contract where the builder handles both design and construction.
  6. Draw — Progress payment (often used interchangeably with pay app).
  7. Estimate — Cost prediction used to build a price and scope.
  8. Field work order — Onsite direction for additional work outside original scope.
  9. Final completion — All work done and punch list closed.
  10. Invoice — Bill for work performed or materials supplied.
  11. Milestone — Major checkpoint (foundation complete, rough-ins complete, etc.).
  12. Punch list — Small corrective/finish items to complete before closeout.
  13. Quantity takeoff (QTO) — Measuring quantities from plans to build an estimate/material list.
  14. RFI (Request for Information) — Formal question seeking clarification on plans/specs.
  15. RFP (Request for Proposal) — Request for detailed proposals (often larger projects).
  16. RFQ (Request for Quotation) — Request for pricing on a defined scope.
  17. Scope creep — Extra work added informally without pricing/approval.
  18. Scope of work (SOW) — Written description of tasks, deliverables, and responsibilities.
  19. Specifications (Specs) — Written requirements for materials, methods, tolerances, and standards.
  20. Standing time — Paid time when crews can’t work due to blockers.
  21. Substantial completion — Project can be used for intended purpose, with minor items remaining.
  22. Duration — Time length of a task or the overall project.

Design, Drawings, and Visualization

  1. As-built drawings — Drawings updated to reflect what was actually installed.
  2. BIM (Building Information Modeling) — 3D model-based design and documentation process.
  3. Blueprints — Traditional term for construction drawings.
  4. BOQ (Bill of Quantities) — Line-item quantities and rates for a project scope.
  5. CAD (Computer-Aided Design) — Software-generated technical drawings.
  6. Drawings — All plan sheets (architectural, structural, MEP, site, etc.).
  7. Elevation — Vertical view of a building face.
  8. Plan view — Top-down view (floor plan).
  9. Section drawing — Cut-through view showing layers and internal details.

Site Work, Earthwork, and Foundations

  1. Bedrock — Solid rock beneath soil layers.
  2. Backfill — Re-filling an excavation after install, typically compacted.
  3. Cut and fill — Excavating in one area and filling another to adjust grade.
  4. Excavation — Digging trenches/holes for utilities, foundations, grading.
  5. Grade — Ground elevation level (above grade/below grade).
  6. Staking — Layout marks that define building corners, offsets, and key points.
  7. Foundation — Structural base supporting the building (footings, walls, slab).

Structural Elements and Concrete Work

  1. Aggregate — Sand and gravel/stone used in concrete.
  2. Beam — Structural member that supports loads across a span.
  3. Bearing capacity — Amount of load soil or a structural element can safely support.
  4. Bearing wall (load-bearing wall) — Wall that carries structural load.
  5. Non-bearing wall — Partition wall that does not carry structural load.
  6. Cement — Binder ingredient used to make concrete.
  7. Concrete — Mix of cement, aggregate, water (and often admixtures).
  8. Cure — Hydration process where concrete hardens over time.
  9. Formwork — Temporary molds used to shape concrete.
  10. Falsework — Temporary support systems used during construction.
  11. Masonry — Brick, block, or stone construction with mortar.
  12. Voids — Unfilled gaps in soil or concrete (intentional or unintentional).

Structural Loads and Framing Concepts

  1. Dead load — Permanent weight of structure/materials.
  2. Live load — Variable load (people, furniture, snow, vehicles).
  3. Cantilever — Projection supported at one end only.
  4. On center (O/C) — Spacing from the center of one framing member to the next.

Mechanical, Electrical, and Specialty Systems

  1. A/C (Air conditioning) — Cooling equipment and distribution components.
  2. Acoustics — Sound behavior and sound control strategies.
  3. HVAC — Heating, ventilation, and air conditioning system.
  4. CFM (Cubic feet per minute) — Airflow measurement (often used in HVAC).
  5. Rough-in — Early stage installation of plumbing/electrical/HVAC before finishes.

Scheduling and Acceleration

  1. Fast-tracking — Overlapping phases to shorten schedule (higher coordination risk).

Roles and Responsibilities

  1. Architect — Designs buildings and may oversee compliance with intent.
  2. Architect-Engineer (A/E) — Individual or firm providing architecture and engineering.
  3. Project manager (PM) — Oversees scope, schedule, budget, coordination.

Bonus contractor terms that come up constantly

  1. Change order (CO) — Written change to scope/cost/time approved by client.
  2. Allowance overage — Cost above allowance amount that client typically pays.
  3. Lead time — Time from ordering to delivery/availability.
  4. Closeout package — Final docs: warranties, lien waivers, manuals, as-builts, CO, etc.

If you want to keep estimates, pricing updates, and project finances organized without juggling spreadsheets, you can explore Bolster or check out Construction Estimating Software.