How to Add Base and Minimum Materials Cost
Add a base or minimum materials cost to a line item to cover setup charges and minimum prices.
More in Estimating
Estimating
Estimate basics
- How to Create a New Estimate
- How to Add an Item to an Estimate
- Sending an Estimate in Bolster
- How to Duplicate an Estimate
- Client Notifications & Activity Tracking
- Manually Accepting Proposals
- How to Change the Salesperson on an Individual Job
Working in the estimate
- How to Enable Estimate Sidebar Settings
- How to Toggle Column Visibility
- How to Resize Columns in the Estimate View
Pricing & markup
- How To Price An Item (Labor, Material, or Subcontractor)
- How to Adjust Profit Markup
- Change Profit Margin Per Line Item
- How to Add a Fee-Based Item
- How Discounts Work in Bolster
- Adding tax to estimate pricing
- Custom Labor Rates & Time Tracking
- Adding Detail to Labor Costing of Items
- Creating a Custom Calculation for Items in an Estimate
Minimums & base costs
- Add Labour Minimum or Base Costs
- How to Add a Labour Minimum or Base Cost
- How to Add a Base or Minimum Materials Cost
- How to Add Base and Minimum Materials Cost
Materials & production
- How to Configure Material Options and Pricing
- Material Tab Overview and Process
- Production Tab For Items
- How to Split Labor and Material Items
- How to Add Production Notes and SKU to Line Items
Takeoff tool
- Takeoff Tool Introduction
- Takeoff Tool Introduction
- Adding a Floorplan and Setting Scale
- How to Measure Inside Lengths
- How to Draw Deck Area and Total Joist Length
- Using the Takeoff Tab for Dimension Input
AI estimating
Overview
You can add a base materials cost or a minimum materials cost to a line item. This is useful when there is a minimum callout cost or minimum price, for example from a subcontractor, for a task you need to do. If the item's materials cost doesn't reach the minimum, the minimum materials cost is used instead.
Open the Item's Materials Options
- In the left-hand menu, click Jobs.
- Click Job list and select the estimate. You can also click Pipeline and select it from there.
- In the estimate, click the cube icon on the line item (for example, Countertop). The item's details open.
- Click Unit pricing to expand it.
- Next to Materials costs, click Materials options.
Add a Base or Minimum Materials Cost
- Under the materials options, click one of the following:
- Add base materials cost: For setup costs or base costs that are not multiplied by the quantity. This acts as a one-time charge per item.
- Add minimum materials cost: Sets the lowest materials cost for the item.
- In the field that appears, enter the amount:
- What is the base cost for this materials item? The total materials cost is the base cost plus the materials cost multiplied by the quantity.
- What is the minimum materials cost for this item?
Tips & Best Practices
- Use a Minimum for Small Jobs: If your estimate for an item doesn't reach a certain threshold, the minimum materials cost kicks in so you still cover your minimum price.
Why This Matters
- You can cover minimum callout costs or minimum prices, such as from a subcontractor, even on small quantities.
- A base materials cost lets you add a one-time setup charge that doesn't change with quantity.
Summary
To add a base or minimum materials cost, click the cube icon on the line item, expand Unit pricing, and click Materials options next to Materials costs. Click Add base materials cost or Add minimum materials cost, then enter the amount.
Next best guides
- Add Labour Minimum or Base CostsVideoEstimating · Minimums & base costs
- How to Add a Labour Minimum or Base CostVideoEstimating · Minimums & base costs
- Custom Labor Rates & Time TrackingVideoEstimating · Pricing & markup
- How To Price An Item (Labor, Material, or Subcontractor)VideoEstimating · Pricing & markup
- Editing a Global Assembly or Template in a ProposalVideoItems, Assemblies & Catalog · Assemblies