How to Add a Fee-Based Item
A fee-based item allows you to set a cost as a percentage of another value in your project, such as project cost.
More in Estimating
Estimating
Estimate basics
- How to Create a New Estimate
- How to Add an Item to an Estimate
- Sending an Estimate in Bolster
- How to Duplicate an Estimate
- Client Notifications & Activity Tracking
- Manually Accepting Proposals
- How to Change the Salesperson on an Individual Job
Working in the estimate
- How to Enable Estimate Sidebar Settings
- How to Toggle Column Visibility
- How to Resize Columns in the Estimate View
Pricing & markup
- How To Price An Item (Labor, Material, or Subcontractor)
- How to Adjust Profit Markup
- Change Profit Margin Per Line Item
- How to Add a Fee-Based Item
- How Discounts Work in Bolster
- Adding tax to estimate pricing
- Custom Labor Rates & Time Tracking
- Adding Detail to Labor Costing of Items
- Creating a Custom Calculation for Items in an Estimate
Minimums & base costs
- Add Labour Minimum or Base Costs
- How to Add a Labour Minimum or Base Cost
- How to Add a Base or Minimum Materials Cost
- How to Add Base and Minimum Materials Cost
Materials & production
- How to Configure Material Options and Pricing
- Material Tab Overview and Process
- Production Tab For Items
- How to Split Labor and Material Items
- How to Add Production Notes and SKU to Line Items
Takeoff tool
- Takeoff Tool Introduction
- Takeoff Tool Introduction
- Adding a Floorplan and Setting Scale
- How to Measure Inside Lengths
- How to Draw Deck Area and Total Joist Length
- Using the Takeoff Tab for Dimension Input
AI estimating
Overview
This is particularly useful for fees like permits, general contractor fees, overhead, or supervision that are calculated as a percentage of another value in your project, such as the overall job cost.
Before You Begin
- Identify the percentage-based fee you want to add and the project value it will be calculated from (e.g., Project Cost).
- In your Estimate, click the Plus Item button.
- Scroll down to More, then select Fee Item.
- Once added, the item will display with a percentage sign symbol.
- To set what the fee is a percentage of, click into the percentage box. This opens Fee Pricing.
- In Fee Pricing, choose the base cost you want the percentage based on along the left-hand side (e.g., Project Cost).
- Add your percentage as a multiplier. For example, to set the fee at 5%, enter project cost * 0.05.
- Name the item to reflect what it represents (e.g., Permit).
Once set, the line item's value will calculate as that percentage of the base cost you selected (for example, 5% of the project cost).
Tips & Best Practices
- Use Clear Naming: Give your fee item a descriptive name so it's easy to identify and understand.
- Verify Your Calculations: Preview your proposal to ensure the fee is calculating correctly.
- Test Different Percentages: If you're unsure about the percentage, try different values and compare the final totals to find the right fit.
Why This Matters
- Lets you charge fees like permits, overhead, or supervision as a percentage of the job rather than a fixed amount.
- Keeps fee-based charges automatically tied to the underlying project value they're based on.
Summary
Adding a fee-based item lets you set a cost as a percentage of another value in your project, such as project cost, by adding a Fee Item and configuring its percentage in Fee Pricing.
Next best guides
- How to Add a Task Item to an EstimateVideoProject Management · Scheduling & tasks
- Understanding Line Item Symbols in BolsterVideoGetting Started · Start here
- How to Add a Base or Minimum Materials CostVideoEstimating · Minimums & base costs
- How to Add Base and Minimum Materials CostVideoEstimating · Minimums & base costs
- How to Configure Material Options and PricingVideoEstimating · Materials & production